| contributor author | Alberto Garcia‐Diaz | |
| contributor author | Judith S. Liebman | |
| date accessioned | 2017-05-08T21:01:52Z | |
| date available | 2017-05-08T21:01:52Z | |
| date copyright | March 1983 | |
| date issued | 1983 | |
| identifier other | %28asce%290733-947x%281983%29109%3A2%28196%29.pdf | |
| identifier uri | http://yetl.yabesh.ir/yetl/handle/yetl/36066 | |
| description abstract | A method for replacing undersized bridges under limited budgets for a specified planning horizon has been developed and applied to the agricultural area of Young America, Illinois. The period of the planning horizon are considered in any arbitrary order, and a subhorizon is defined between the beginning of the overall planning horizon and each period. For each subhorizon, the most cost‐effective bridge replacement policy is selected, according to a route assignment procedure. This procedure is a heuristic method that identifies the most important users of a transportation system and sequentially reroutes them, starting with the most economical routes and finishing with routes without undersized bridges for any user. | |
| publisher | American Society of Civil Engineers | |
| title | Optimal Strategies for Bridge Replacement | |
| type | Journal Paper | |
| journal volume | 109 | |
| journal issue | 2 | |
| journal title | Journal of Transportation Engineering, Part A: Systems | |
| identifier doi | 10.1061/(ASCE)0733-947X(1983)109:2(196) | |
| tree | Journal of Transportation Engineering, Part A: Systems:;1983:;Volume ( 109 ):;issue: 002 | |
| contenttype | Fulltext | |