Show simple item record

contributor authorAlberto Garcia‐Diaz
contributor authorJudith S. Liebman
date accessioned2017-05-08T21:01:52Z
date available2017-05-08T21:01:52Z
date copyrightMarch 1983
date issued1983
identifier other%28asce%290733-947x%281983%29109%3A2%28196%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/36066
description abstractA method for replacing undersized bridges under limited budgets for a specified planning horizon has been developed and applied to the agricultural area of Young America, Illinois. The period of the planning horizon are considered in any arbitrary order, and a subhorizon is defined between the beginning of the overall planning horizon and each period. For each subhorizon, the most cost‐effective bridge replacement policy is selected, according to a route assignment procedure. This procedure is a heuristic method that identifies the most important users of a transportation system and sequentially reroutes them, starting with the most economical routes and finishing with routes without undersized bridges for any user.
publisherAmerican Society of Civil Engineers
titleOptimal Strategies for Bridge Replacement
typeJournal Paper
journal volume109
journal issue2
journal titleJournal of Transportation Engineering, Part A: Systems
identifier doi10.1061/(ASCE)0733-947X(1983)109:2(196)
treeJournal of Transportation Engineering, Part A: Systems:;1983:;Volume ( 109 ):;issue: 002
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record