Show simple item record

contributor authorGunther Greulich
contributor authorClifford E. Rober
date accessioned2017-05-08T21:01:06Z
date available2017-05-08T21:01:06Z
date copyrightFebruary 1988
date issued1988
identifier other%28asce%290733-9453%281988%29114%3A1%2826%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/35559
description abstractTall buildings have mushroomed in Boston as they have elsewhere. Modern technology has made high‐rise construction efficient and architects more daring. The surveying engineer faces many adversities during the translation process from blueprint to construction site. Temperature, vibration, short sights, compression, column shortening, settlement, and even tides and hurricanes demand careful attention. Personal experiences of the writers confirm warnings of the American Institute of Steel Construction, which are often ignored by construction managers. The surveying engineer and the construction manager should discuss reliable survey control procedures beforehand. By anticipating inevitable problems, their damaging effects can be minimized. A unique monitoring experience during Hurricane Gloria produced surprisingly sudden, jerky building motions.
publisherAmerican Society of Civil Engineers
titleMonitoring of High‐Rise Buildings
typeJournal Paper
journal volume114
journal issue1
journal titleJournal of Surveying Engineering
identifier doi10.1061/(ASCE)0733-9453(1988)114:1(26)
treeJournal of Surveying Engineering:;1988:;Volume ( 114 ):;issue: 001
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record