Show simple item record

contributor authorD. R. Friedrich
contributor authorJ. P. Daly, Jr.
contributor authorW. G. Dick
date accessioned2017-05-08T20:56:42Z
date available2017-05-08T20:56:42Z
date copyrightSeptember 1987
date issued1987
identifier other%28asce%290733-9364%281987%29113%3A3%28488%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/32731
description abstractThe effects of revisions, repairs, and rework on large, complex projects are very substantial and are not frequently dealt with in a comprehensive, consistent, or effective manner, even in industries that deal constantly with very large projects, such as the commercial nuclear power industry. Large‐scale commercial nuclear projects require multiple work phases and disciplines that result in substantial and significant interdependencies among these work phases and disciplines. These interdependencies and the complex interactions that result are key factors in understanding, controlling, and managing such projects. Of particular relevance are the consequences of these interdependencies upon effective project work scope caused by revisions, repairs, and rework. This study examines these effects using a simplified mathematical model constructed to correspond with intuitive reasoning and empirical observations. A range of hypothetical examples is also provided to illustrate the consequences of these effects.
publisherAmerican Society of Civil Engineers
titleRevisions, Repairs, and Rework on Large Projects
typeJournal Paper
journal volume113
journal issue3
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/(ASCE)0733-9364(1987)113:3(488)
treeJournal of Construction Engineering and Management:;1987:;Volume ( 113 ):;issue: 003
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record