| contributor author | Chien-Cheng Chou | |
| contributor author | Carlos H. Caldas | |
| contributor author | James T. O’Connor | |
| contributor author | Adam W. Sroka | |
| contributor author | Grant K. Goldman | |
| date accessioned | 2017-05-08T20:51:31Z | |
| date available | 2017-05-08T20:51:31Z | |
| date copyright | September 2009 | |
| date issued | 2009 | |
| identifier other | %28asce%290733-9364%282009%29135%3A9%28812%29.pdf | |
| identifier uri | http://yetl.yabesh.ir/yetl/handle/yetl/29486 | |
| description abstract | The adjustment of utilities prior to highway construction is a particularly complex and challenging operation. One strategy that has been adopted in the last two decades is to incorporate utility adjustment work into highway construction contracts. In theory, this approach eliminates or reduces some of the complications and risks of utility adjustments. This paper aims to identify and analyze the decision drivers for selecting this strategy and help alleviate its implementation challenges. To this end, a comprehensive literature review and several interviews with experts from state departments of transportation and utility companies were conducted. Assessment surveys regarding the performance of recent projects that used the combined strategy were performed. Conclusions and recommendations for future research are presented. | |
| publisher | American Society of Civil Engineers | |
| title | Identification of Decision Drivers for the Strategy of Incorporating Utility Relocations into Highway Construction Contracts | |
| type | Journal Paper | |
| journal volume | 135 | |
| journal issue | 9 | |
| journal title | Journal of Construction Engineering and Management | |
| identifier doi | 10.1061/(ASCE)0733-9364(2009)135:9(812) | |
| tree | Journal of Construction Engineering and Management:;2009:;Volume ( 135 ):;issue: 009 | |
| contenttype | Fulltext | |