Show simple item record

contributor authorRussell King
date accessioned2017-05-08T20:49:41Z
date available2017-05-08T20:49:41Z
date copyrightMarch 1987
date issued1987
identifier other%28asce%290733-9364%281987%29113%3A1%281%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/28397
description abstractThis paper discusses problems with contract documents prepared for roadway rehabilitation that field engineers experience during construction. It addresses the issues of existing utilities, drainage, and right‐of‐way restrictions as they impact proposed construction. It identifies specific problem areas experienced during construction and describes modifications that were made in the field in order to solve the problems. The major theme of the paper is that not enough time and/or consideration seems to be given to alleviate conflicts with existing conditions during design. This means that significant design modifications must be made in the field in order for many of the items to be constructed. The paper raises the issue that a better product will result if conflicts are eliminated during design. Persons most interested in this paper may be designers or people who review plans. Contractors and field personnel can benefit from it also because of the examples given toward solving the problems.
publisherAmerican Society of Civil Engineers
titleDesigning Plans for Constructibility
typeJournal Paper
journal volume113
journal issue1
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/(ASCE)0733-9364(1987)113:1(1)
treeJournal of Construction Engineering and Management:;1987:;Volume ( 113 ):;issue: 001
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record