Show simple item record

contributor authorXiaoming Mao
contributor authorXueqing Zhang
date accessioned2017-05-08T20:49:38Z
date available2017-05-08T20:49:38Z
date copyrightMay 2008
date issued2008
identifier other%28asce%290733-9364%282008%29134%3A5%28371%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/28364
description abstractA construction process reengineering framework and its corresponding methodologies have been developed by integrating lean principles and computer simulation techniques. Instead of classifying activities into value-adding and non-value-adding activities, or into conversion and flow activities as is common in lean production practices, this framework classifies activities into main and supportive activities and/or into normal and interactive activities. This classification makes it more effective in modeling the construction workflow and reengineering the construction process. It also avoids the confusion of the classification of activities into value-adding and non-value-adding activities encountered in the construction industry. In addition, computer simulation techniques are incorporated into the framework to virtually simulate and assess the efficiency and effectiveness of the reengineered construction process that is achieved based on lean principles. Simulation makes it easier to quantify and assess the effectiveness and efficiency of the reengineered construction process.
publisherAmerican Society of Civil Engineers
titleConstruction Process Reengineering by Integrating Lean Principles and Computer Simulation Techniques
typeJournal Paper
journal volume134
journal issue5
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/(ASCE)0733-9364(2008)134:5(371)
treeJournal of Construction Engineering and Management:;2008:;Volume ( 134 ):;issue: 005
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record