Show simple item record

contributor authorArif A. Anwar
contributor authorTonny T. de Vries
date accessioned2017-05-08T20:49:24Z
date available2017-05-08T20:49:24Z
date copyrightFebruary 2004
date issued2004
identifier other%28asce%290733-9437%282004%29130%3A1%2817%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/28226
description abstractA sequential irrigation schedule that honors user demands of duration and minimizes earliness and tardiness is interpreted as a single-machine schedule with earliness and tardiness costs and a common deadline (or fixed interval). A heuristic solution is presented for this irrigation scheduling problem. Four models are presented to reflect the different methods in which an irrigation system at the tertiary unit level may be operated, the first model permits jobs to be noncontiguous, i.e., idle time between jobs is permitted, whereas the others permit contiguous jobs only. The heuristic is tested extensively and the solution quality is compared with either an optimum solution from an integer program or the best available solution obtained from an integer program within allocated computation time. The heuristic is computationally efficient for all models presented, however for schedules with noncontiguous jobs, or where idle time is inserted before and after a contiguous set of jobs, solution quality deteriorates. The work brings the science of single scheduling from operations research into irrigation scheduling and suggests areas for further development.
publisherAmerican Society of Civil Engineers
titleIrrigation Scheduling. II: Heuristics Approach
typeJournal Paper
journal volume130
journal issue1
journal titleJournal of Irrigation and Drainage Engineering
identifier doi10.1061/(ASCE)0733-9437(2004)130:1(17)
treeJournal of Irrigation and Drainage Engineering:;2004:;Volume ( 130 ):;issue: 001
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record