Show simple item record

contributor authorPooran S. Mahar
contributor authorRajesh P. Singh
date accessioned2017-05-08T20:49:12Z
date available2017-05-08T20:49:12Z
date copyrightOctober 2001
date issued2001
identifier other%28asce%290733-9437%282001%29127%3A5%28277%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/28069
description abstractThis paper presents a methodology to select a sprinkler lateral from different design alternatives for a duration shorter than its full life cycle. The selection is made by determining the time period up to which an alternative would be more economical than others. The developed methodology uses the break-even analysis involving total annual cost with escalating cost factors. The analysis is carried out by using a numerical method to solve a function of difference between total annual cost of two design alternatives. The application of the developed methodology is illustrated by solving an example.
publisherAmerican Society of Civil Engineers
titleSelection of Sprinkler Lateral for Shorter Life Cycle
typeJournal Paper
journal volume127
journal issue5
journal titleJournal of Irrigation and Drainage Engineering
identifier doi10.1061/(ASCE)0733-9437(2001)127:5(277)
treeJournal of Irrigation and Drainage Engineering:;2001:;Volume ( 127 ):;issue: 005
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record