Show simple item record

contributor authorManuel E. Sellés
contributor authorJose A. Rubio
contributor authorJavier Reig Mullor
date accessioned2017-05-08T20:48:12Z
date available2017-05-08T20:48:12Z
date copyrightOctober 2008
date issued2008
identifier other%28asce%290733-9364%282008%29134%3A10%28749%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/27686
description abstractThis study develops a quantification proposal for those quality costs that construction companies cannot estimate through objective criteria, known as hidden quality costs. This proposal will later be the object of validation through a real case: the quantification of the cost of loss of image that a construction company experiences as a consequence of a delay in the completion of a certain building. This proposal is of relevance to researchers in that it demonstrates how hidden cost quantification based on a fuzzy logic model can be developed and tested, and it provides the basis for future investigations. It is of relevance to professionals as it describes how fuzzy logic and quality costs can be used to effectively model industrial construction quality management.
publisherAmerican Society of Civil Engineers
titleDevelopment of a Quantification Proposal for Hidden Quality Costs: Applied to the Construction Sector
typeJournal Paper
journal volume134
journal issue10
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/(ASCE)0733-9364(2008)134:10(749)
treeJournal of Construction Engineering and Management:;2008:;Volume ( 134 ):;issue: 010
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record