description abstractThe terms of concession including tariff and concession period are often discussed intensively during negotiations of build-operate-transfer (BOT) contracts. Based on prior studies on negotiation terms and risk of BOT contracts, this paper incorporates risk attributes of the BOT project into the formulation of a contractual-negotiation model. The proposed model allows the government and the sponsor to reach a consensus on the terms should the financial return as well as the risk of the project be determined. The pro forma cash flow of a BOT project is developed and used to generate the probability distribution of net present values (NPV) from the owner’s viewpoint by using Monte Carlo simulation. High- and low-risk scenarios are obtained to determine whether the contractual-negotiation models vary in accordance with risk levels. Results show that, given the expected NPV, the sponsor should be offered more favorable concessional terms for projects with high risk than that with low risk. We suggest that the government and industry practitioners embody the risk attributes of the project in the automated contractual-negotiation model.
publisherAmerican Society of Civil Engineers
titleAutomated Approach to Negotiations of BOT Contracts with the Consideration of Project Risk
typeJournal Paper
journal volume134
journal issue1
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/(ASCE)0733-9364(2008)134:1(18)
treeJournal of Construction Engineering and Management:;2008:;Volume ( 134 ):;issue: 001
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record