contributor authorEdward B. Kinner
contributor authorWesley E. Stimpson
date accessioned2017-05-08T20:39:05Z
date available2017-05-08T20:39:05Z
date copyrightMarch 1983
date issued1983
identifier other%28asce%290733-9364%281983%29109%3A1%2874%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/22397
description abstractConstruction of the Trident drydock required lowering piezometric levels in a sand and gravel aquifer underlying the drydock site 100 ft (30.5 m). The design of the construction dewatering system was based on a 15‐day, 1,900 gpm (120 L/s) pump test. The dewatering system consisted of five pumped wells installed at the shore, 12 pumped wells installed through the cofferdam at the drydock site, and 15 unpumped wells installed inside the cofferdam after unwatering and subgrade preparation. Details of the well systems, installation procedures, power supplies, design features, and as‐constructed geometries, are provided. The results of individual and well system tests are presented and related to design assumptions. Construction performance of the various well systems is described. Well performance data indicated aquifer conditions were more variable than assumed for design. However, the well system as designed was sufficiently redundant to readily provide the required reduction in piezometric level to allow drydock construction.
publisherAmerican Society of Civil Engineers
titleArtesian Pressure Relief for Trident Drydock
typeJournal Paper
journal volume109
journal issue1
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/(ASCE)0733-9364(1983)109:1(74)
treeJournal of Construction Engineering and Management:;1983:;Volume ( 109 ):;issue: 001
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record