contributor authorR. J. Dzeng
contributor authorW. C. Wang
contributor authorH. P. Tserng
date accessioned2017-05-08T20:37:43Z
date available2017-05-08T20:37:43Z
date copyrightFebruary 2004
date issued2004
identifier other%28asce%290733-9364%282004%29130%3A1%285%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/21676
description abstractInfrastructure projects such as the construction of expressways are often distributed over different regions and must therefore be divided into several tendering packages. The public agencies that administrate such projects manage project packages that must be integrated. All project packages may involve similar work. However, they are carried out by different contractors each with their own scheduling practices. Standardization provides a foundation for more efficient and effective schedule integration, but cannot easily be enforced without objections from contractors. This paper presents a three-stage standardization implementation framework using modularization. A set of network modules that involve normal, repetitive, cyclic, and merging activities was developed for expressway projects. Two computer systems were developed to help contractors use these modules to create schedules, and to help the owner review schedules submitted by contractors. Experiments and a survey were also carried out to validate the proposed framework, demonstrating a significant amount of time saving and errors reduced by using network modules.
publisherAmerican Society of Civil Engineers
titleModule-Based Construction Schedule Administration for Public Infrastructure Agencies
typeJournal Paper
journal volume130
journal issue1
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/(ASCE)0733-9364(2004)130:1(5)
treeJournal of Construction Engineering and Management:;2004:;Volume ( 130 ):;issue: 001
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record