description abstractIn December 1985, construction began on the offshore portion of the Renton Effluent Transfer System. Under the auspices of the Municipality of Metropolitan Seattle (Metro), treated effluent is pumped to Duwamish Head where the flow is separated into two 1.63‐m‐diameter steel pipes that extend about 3,050 m offshore into Puget Sound. A 155‐m long diffuser section at the end of each pipe rests in about 185 m of water. A submarine slide occurred in Puget Sound during the dredging operation for the construction of the offshore portion of the pipeline. The slide occurred during low tide and involved
publisherAmerican Society of Civil Engineers
titleSubmarine Flow Slide in Puget Sound
typeJournal Paper
journal volume118
journal issue10
journal titleJournal of Geotechnical Engineering
identifier doi10.1061/(ASCE)0733-9410(1992)118:10(1577)
treeJournal of Geotechnical Engineering:;1992:;Volume ( 118 ):;issue: 010
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record