Show simple item record

contributor authorI. Bogardi
contributor authorW. E. Kelly
contributor authorA. Bardossy
date accessioned2017-05-08T20:35:31Z
date available2017-05-08T20:35:31Z
date copyrightOctober 1990
date issued1990
identifier other%28asce%290733-9410%281990%29116%3A10%281502%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/20546
description abstractA methodology is presented for predicting postconstruction reliability of full‐scale soil liners given a set of direct and indirect (compaction moisture content and dry density) permeability measurements from a test fill. The permeability is considered as a spatially correlated, lognormally distributed random variable. Six systems‐reliability measures are defined to characterize a soil liner represented by a system of blocks and lifts. The reliability measures are weakest link, averaging and parallel systems of blocks and lifts. Geostatistics is used to transfer test‐fill information to full‐scale liner permeability/reliability estimates. A relationship is developed for the number of permeability measurements necessary to monitor construction of the full‐scale liner, the target average permeability, and the specified reliability limit. The methodology is illustrated with a numerical example. It is shown how direct permeability measurements and surrogate tests commonly performed during soil‐liner construction can be combined. Reliability bounds, based on effective hydraulic permeability, can be obtained by considering various simple averaging schemes over a multilift soil liner.
publisherAmerican Society of Civil Engineers
titleReliability Model for Soil Liner: Post Construction
typeJournal Paper
journal volume116
journal issue10
journal titleJournal of Geotechnical Engineering
identifier doi10.1061/(ASCE)0733-9410(1990)116:10(1502)
treeJournal of Geotechnical Engineering:;1990:;Volume ( 116 ):;issue: 010
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record