Show simple item record

contributor authorAndrew Shing-Tao Chang
date accessioned2017-05-08T20:32:44Z
date available2017-05-08T20:32:44Z
date copyrightApril 2001
date issued2001
identifier other%28asce%290733-9364%282001%29127%3A2%28163%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/19165
description abstractThe purpose of this paper is to present a work-time model for engineers. Engineers accomplish tasks by using their time when working on engineering or construction projects. Traditional project management records only work hours on tasks charged by engineers, but whether engineers spend time on direct work or communication is usually not tracked. Project tasks entail various degrees of uncertainty and ambiguity that require different work mechanisms and amounts of time. To address this issue, a model of arranging engineers' work mechanisms and time on tasks was developed. The model tested valid on a design project by showing that the fit between planned and actual work hour patterns is associated with better performance. From a system viewpoint, engineers' work mechanisms and time as input variables provide early symptomatic data and prediction about project operations, which provides a guide for the behavior of engineers.
publisherAmerican Society of Civil Engineers
titleWork-Time Model for Engineers
typeJournal Paper
journal volume127
journal issue2
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/(ASCE)0733-9364(2001)127:2(163)
treeJournal of Construction Engineering and Management:;2001:;Volume ( 127 ):;issue: 002
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record