A Multiple-Objective Decision-Support Model for Lighting Maintenance Routing Considering Carbon Dioxide Emissions and Balanced Workload
(ASCE, 5/23/2023 )The lighting system as a crucial urban infrastructure needs to be maintained to uphold good performance. The planning and scheduling of maintenance for geographically distributed lighting systems is a complex research ... -
Optimization of Capital Structure for Urban Water PPP Projects Using Mezzanine Financing: Sustainable Perspective
(ASCE, 5/19/2023 )An optimal capital structure can minimize financing cost and maximize project value. Most existing studies have focused on the equity-debt financing mode for public–private partnership (PPP) projects, neglecting the usage ... -
Isomorphic Pressures to Catalyze Innovation Diffusion in Construction Project–Based Organizations: Identification of Source Factors
(ASCE, 12/5/2022 )Innovation is widely considered the lifeblood of organizational survival and growth. However, despite its importance, innovation diffusion does not take place spontaneously in organizations. In fact, diffusion of innovations ... -
Optimizing Modularization of Residential Housing Designs for Rapid Postdisaster Mass Production of Housing
(ASCE, 4/26/2023 )Postdisaster housing reconstruction (PDHR) is a highly complex process because of the large number of recovery projects for affected communities and the shortage of resources after a disastrous event. PDHR also needs a ... -
Single-Side Accumulative Jacking Construction Method for Large-Span Arched Latticed Shells
(ASCE, 2022/12/01)For large-span spatial structures, we have been committed to exploring new effective construction methods to avoid the drawbacks of traditional construction methods. This study proposes an efficient and cost-effective ... -
Exploring the Concept of Psychological Distance and Its Impact on Intention to Settle in Construction Dispute Negotiation
(ASCE, 2022/12/01)Negotiation is the most frequently used and economical way of resolving construction disputes. However, negotiators are not always rational decision makers. It is not uncommon to find that negotiations fail despite the ... -
Shared Transformational Leadership for Green Architecture Engineering and Construction Project Teams: A Study of LEED Projects
(ASCE, 2022/12/01)Green architecture, engineering, and construction (AEC) projects are deemed more complicated compared with their traditional counterparts. They have been reported to have relatively more frequent delays and higher cost ... -
Predicting Construction Workforce Demand Using a Combination of Feature Selection and Multivariate Deep-Learning Seq2seq Models
(ASCE, 2022/12/01)Construction companies struggle with their hiring plans and react to economic shifts afterward, resulting in unnecessary layoffs and overhirings. A model that forecasts future construction hiring can help adjust hiring ... -
Quality Failures–Based Critical Cost Impact Factors: Logistic Regression Analysis
(ASCE, 2022/12/01)Due to the various dynamic conditions of construction sites, quality failures have become part and parcel of the industry. Many studies have identified the causal factors of construction site quality failures and their ... -
Experimental and Numerical Study on the Dynamic Response of a Superthick Backfill Subgrade under High-Speed Railway Loading: A Case Study of Qianjiang–Zhangjiajie–Changde Railway
(ASCE, 2022/12/01)In this study, a mountain tunnel of the Qianjiang–Zhangjiajie–Changde Railway, which passes through a giant karst cave at a high position, was investigated as a case study. The cave cavity height below the tunnel track is ... -
Synthesis of Relational Practices for PPP Contracts and Their Linkage with Governance Mechanisms
(ASCE, 2022/12/01)Contractual governance is considered sufficient to govern particular types of exchanges. In the presence of well-known transaction hazards, however, relational governance is increasingly viewed as a necessary complement ... -
A System-Dynamic Model for Evaluating the Effect of Person–Team Fit on Project Performance
(ASCE, 2022/11/01)The dynamic nature of construction projects has made teams the best approach for responding to changing project needs. As a result, the performance of the project engineering team, which has the responsibility to manage ... -
Project Schedule Development under Environment-Induced Time-Window Constraints: Case of Constructing River-Crossing Bridge in Remote Northern Region
(ASCE, 2022/12/01)A review of literature and practice indicates that there has been a lack of academic research and that there is a shortage of appropriate methods for construction planning and project scheduling for development of projects ... -
Work Density Method for Takt Planning of Construction Processes with Nonrepetitive Work
(ASCE, 2022/12/01)A new method is presented for construction process planning. It is based on the concept of work density and called the Work Density Method (WDM), two terms coined for use in this context. Using the WDM, planners create ... -
Job Quality and Construction Workers’ Mental Health: Life Course Perspective
(ASCE, 2022/12/01)Psychosocial job quality has been proven to be linked to workers’ mental health. Drawing on a life course perspective, this study sought to identify, compare, and contrast the psychosocial characteristics of job quality ... -
Climbing the Pyramid of Megaproject Social Responsibility: Impacts of External Stakeholders and Project Complexity
(ASCE, 2022/11/01)Megaproject social responsibility (MSR) has received a great deal of attention from both academics and practitioners. However, as a very broad and complex concept, MSR requires an in-depth investigation of its components, ... -
System Configuration Design of BIM Object-Oriented Database for Civil Engineering
(ASCE, 2022/12/01)Building information modeling (BIM) creates tremendous value for civil engineering through information integration. Not only does it make the formulation of data storage strategies more important at the beginning of a civil ... -
Influencing Factors of Early Termination for PPP Projects Based on Multicase Grounded Theory
(ASCE, 2022/11/01)The public-private partnership (PPP) model has been widely used in infrastructure projects around the world to alleviate government shortages of funding and practical experience. Although the early termination of PPP ... -
Investigating the New Zealand Off-Site Manufacturing Industry’s Readiness for Automated Compliance Checking