Show simple item record

contributor authorReza Lashgari, Hamid
contributor authorHanaei, Amir
contributor authorAdeli, A. R.
date accessioned2017-05-09T01:11:56Z
date available2017-05-09T01:11:56Z
date issued2014
identifier issn0094-9930
identifier otherpvt_136_02_025501.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/156130
description abstractRiskbased inspection program (RBI) is a decision making techniques for providing refineries and petrochemical plants with an effective and appropriate inspection planning. The aim of the present study is to analyze failure behavior and risk ranking of خ±MDEA fin/fan cooler of CO2 removal unit based on API 581 in order to find out the reason(s) of tubes failure. According to previous experience in similar plant, risk calculation results and conducted inspection activity by using RFT eddy current technique, CO2 corrosion damage mechanism was identified as a main reason of tubes failure. In next step, process key variable, prevention/mitigation methods and inspection planning programs were determined so as to minimize the similar failure behavior in the rest of the lean amine aircooled heat exchangers of CO2 removal unit.
publisherThe American Society of Mechanical Engineers (ASME)
titleFailure Analysis of خ± MDEA Air Cooled Heat Exchanger of CO2 Removal Unit Based on the Semiquantitative Risk Based Inspection Method
typeJournal Paper
journal volume136
journal issue2
journal titleJournal of Pressure Vessel Technology
identifier doi10.1115/1.4025783
journal fristpage25501
journal lastpage25501
identifier eissn1528-8978
treeJournal of Pressure Vessel Technology:;2014:;volume( 136 ):;issue: 002
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record