Show simple item record

contributor authorGrace, Dale
contributor authorChristiansen, Thomas
date accessioned2017-05-09T00:58:02Z
date available2017-05-09T00:58:02Z
date issued2013
identifier issn1528-8919
identifier othergtp_135_2_021801.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/151552
description abstractUnexpected outages and maintenance costs reduce plant availability and can consume significant resources to restore the unit to service. This paper describes a survey and analysis of unplanned outage events for 388 combinedcycle plants, based on 164 D/EClass and 224 FClass gas turbines. The 15year timeframe included over 3000 unityears of data. The causes and durations of forced outages and unscheduled maintenance were identified, and overall reliability and availability were established for each class of plant. Costs to restore the unit to service for each main outage cause were estimated, as were net revenues lost due to unplanned outages. A statistical approach to estimated costs and lost revenues provides a riskbased means to quantify the impact of unplanned events on plant cash flow as a function of class of gas turbine and plant subsystem. The riskbased assessment defines the range of probable costs of unplanned outage events.
publisherThe American Society of Mechanical Engineers (ASME)
titleRisk Based Assessment of Unplanned Outage Events and Costs for Combined Cycle Plants
typeJournal Paper
journal volume135
journal issue2
journal titleJournal of Engineering for Gas Turbines and Power
identifier doi10.1115/1.4007732
journal fristpage21801
journal lastpage21801
identifier eissn0742-4795
treeJournal of Engineering for Gas Turbines and Power:;2013:;volume( 135 ):;issue: 002
contenttypeFulltext