Show simple item record

contributor authorToshiharu Miwa
contributor authorKosuke Ishii
date accessioned2017-05-09T00:32:02Z
date available2017-05-09T00:32:02Z
date copyrightSeptember, 2009
date issued2009
identifier issn1530-9827
identifier otherJCISB6-26005#034502_1.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/140126
description abstractThe acceleration of the product development cycle continues to be a significant challenge for manufacturing enterprises around the world. This paper describes a task planning method that minimizes the number of trial and error to reduce the development time for large-scale and complex products at the early stage of product development. The proposed method matches groups of product components and determines the development sequence for each component to minimize the amount of feedback information required across task groups. The method provides, as evaluation indices for task prioritization, the product-sum of engineering interaction among components and worth of each component, which the authors define as the “worth flow.” A generic hair dryer with simple mechanical structure serves as an example, illustrating that the proposed method contributes to the reduction in the amount of information required for setting the interface links by 65% compared with the conventional planning methods.
publisherThe American Society of Mechanical Engineers (ASME)
titleProduct Development Task Planning Using Worth Flow Analysis
typeJournal Paper
journal volume9
journal issue3
journal titleJournal of Computing and Information Science in Engineering
identifier doi10.1115/1.3184589
journal fristpage34502
identifier eissn1530-9827
keywordsFlow (Dynamics)
keywordsProduct development
keywordsFeedback
keywordsManufacturing AND Errors
treeJournal of Computing and Information Science in Engineering:;2009:;volume( 009 ):;issue: 003
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record