| contributor author | L. R. Basinski | |
| contributor author | D. E. McKinley | |
| date accessioned | 2017-05-09T00:06:39Z | |
| date available | 2017-05-09T00:06:39Z | |
| date copyright | January, 1968 | |
| date issued | 1968 | |
| identifier issn | 1528-8919 | |
| identifier other | JETPEZ-26667#65_1.pdf | |
| identifier uri | http://yetl.yabesh.ir/yetl/handle/yetl/126279 | |
| description abstract | This paper emphasizes the point that performance testing of large steam turbines in accordance with the provisions of ASME Power Test Code No. 6–1964 requires extensive coordination between turbine manufacturer and the operating utility. This paper outlines the procedures followed in preparing for, conducting, and analyzing the results of performance tests conducted on two, duplicate, 580-MW cross-compound steam turbines installed in the Joliet Station of the Commonwealth Edison Company. Selection of test instrumentation and methods of calculating the test performance are discussed. Application of on-line and off-line digital computers for calculation of test results is reviewed. Problems encountered during the tests which affected accuracy of calculated results are outlined. | |
| publisher | The American Society of Mechanical Engineers (ASME) | |
| title | Performance Testing of 580-MW Joliet Units No. 7 and No. 8 | |
| type | Journal Paper | |
| journal volume | 90 | |
| journal issue | 1 | |
| journal title | Journal of Engineering for Gas Turbines and Power | |
| identifier doi | 10.1115/1.3609136 | |
| journal fristpage | 65 | |
| journal lastpage | 72 | |
| identifier eissn | 0742-4795 | |
| keywords | Testing performance | |
| keywords | Steam turbines | |
| keywords | Instrumentation | |
| keywords | Turbines AND Computers | |
| tree | Journal of Engineering for Gas Turbines and Power:;1968:;volume( 090 ):;issue: 001 | |
| contenttype | Fulltext | |