Show simple item record

contributor authorL. R. Basinski
contributor authorD. E. McKinley
date accessioned2017-05-09T00:06:39Z
date available2017-05-09T00:06:39Z
date copyrightJanuary, 1968
date issued1968
identifier issn1528-8919
identifier otherJETPEZ-26667#65_1.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/126279
description abstractThis paper emphasizes the point that performance testing of large steam turbines in accordance with the provisions of ASME Power Test Code No. 6–1964 requires extensive coordination between turbine manufacturer and the operating utility. This paper outlines the procedures followed in preparing for, conducting, and analyzing the results of performance tests conducted on two, duplicate, 580-MW cross-compound steam turbines installed in the Joliet Station of the Commonwealth Edison Company. Selection of test instrumentation and methods of calculating the test performance are discussed. Application of on-line and off-line digital computers for calculation of test results is reviewed. Problems encountered during the tests which affected accuracy of calculated results are outlined.
publisherThe American Society of Mechanical Engineers (ASME)
titlePerformance Testing of 580-MW Joliet Units No. 7 and No. 8
typeJournal Paper
journal volume90
journal issue1
journal titleJournal of Engineering for Gas Turbines and Power
identifier doi10.1115/1.3609136
journal fristpage65
journal lastpage72
identifier eissn0742-4795
keywordsTesting performance
keywordsSteam turbines
keywordsInstrumentation
keywordsTurbines AND Computers
treeJournal of Engineering for Gas Turbines and Power:;1968:;volume( 090 ):;issue: 001
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record