Show simple item record

contributor authorJ. S. Noble
contributor authorC. M. Klein
contributor authorA. Midha
date accessioned2017-05-08T23:57:09Z
date available2017-05-08T23:57:09Z
date copyrightNovember, 1998
date issued1998
identifier issn1087-1357
identifier otherJMSEFK-27335#802_1.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/120727
description abstractMaterial flow system design problems (i.e. facility layout, material handling equipment selection and specification, flow path design, unit load sizing, cell design, warehousing, routing, etc.) have been predominately modelled independently in the past. Independent consideration of each design problem has reduced the solution complexity, but in the process has caused a loss in problem reality. This paper reviews recent developments in integrated approaches to material flow design and presents a model which integrates material handling equipment selection and specification (including material handling interface equipment) and path/load dependent unit load size. The formulation is solved using the meta-heuristic procedure of tabu search to find good solutions to the more realistic (and more complex) model formulation.
publisherThe American Society of Mechanical Engineers (ASME)
titleAn Integrated Model of the Material Handling System and Unit Load Design Problem
typeJournal Paper
journal volume120
journal issue4
journal titleJournal of Manufacturing Science and Engineering
identifier doi10.1115/1.2830223
journal fristpage802
journal lastpage806
identifier eissn1528-8935
keywordsMaterials handling
keywordsStress
keywordsDesign
keywordsFlow (Dynamics)
keywordsMaterials handling equipment AND Plant layout
treeJournal of Manufacturing Science and Engineering:;1998:;volume( 120 ):;issue: 004
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record