Show simple item record

contributor authorI. S. Diakunchak
date accessioned2017-05-08T23:35:24Z
date available2017-05-08T23:35:24Z
date copyrightOctober, 1991
date issued1991
identifier issn1528-8919
identifier otherJETPEZ-26691#482_1.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/108479
description abstractThe fully loaded factory test of the CW251B12 45 MW class industrial gas turbine is described in this paper. This gas turbine is the latest uprating of the W251 series of engines. The main objectives of the factory test were the verification of the performance and the mechanical integrity of the new engine model. A brief description of the main features of the engine, the application of the first unit, the test facility, and the engine instrumentation used in the test is included. Details of the engine performance test results, telemetry test data results, and the hot end component metal temperature measurements are provided.
publisherThe American Society of Mechanical Engineers (ASME)
titleFully Loaded Factory Test of the CW251B12 Gas Turbine Engine
typeJournal Paper
journal volume113
journal issue4
journal titleJournal of Engineering for Gas Turbines and Power
identifier doi10.1115/1.2906265
journal fristpage482
journal lastpage487
identifier eissn0742-4795
keywordsGas turbines
keywordsEngines
keywordsIndustrial gases
keywordsMetals
keywordsTemperature measurement
keywordsInstrumentation
keywordsTurbines
keywordsTelemetry
keywordsTest facilities AND Testing performance
treeJournal of Engineering for Gas Turbines and Power:;1991:;volume( 113 ):;issue: 004
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record