Search
Now showing items 1-2 of 2
Precast Component Production Scheduling Considering Outsourcing and Multiskilled Resources
Publisher: American Society of Civil Engineers
Abstract: AbstractPrecast component (PC) production is a critical stage within the prefabricated construction
supply chain. Motivated by a practical challenge observed in PC manufacturing, this
study investigates an integrated PC ...
An Improved Model for Precast Component Transportation Scheduling under Dynamic Traffic and Weather Conditions
Publisher: American Society of Civil Engineers
Abstract: AbstractTransportation scheduling serves as a critical bridge between inventory management
and the on-site assembly of precast components (PCs). However, dynamic traffic situations
have been oversimplified in existing ...
CSV
RIS