Search
Now showing items 1-1 of 1
Prediction Method of Tunnel-Blasting Ground Vibration in Sand–Mudstone Interbedded Area Using IPSO-BPNN Algorithm
Publisher: American Society of Civil Engineers
Abstract: Abstract Addressing the high risks associated with blasting construction in sand–mudstone interbedded
areas and the challenges in accurately predicting surface vibration velocity, this
study proposes a prediction method ...
CSV
RIS