YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    Search 
    •   YE&T Library
    • Search
    •   YE&T Library
    • Search
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Use filters to refine the search results.

    Now showing items 1-3 of 3

    • Relevance
    • Title Asc
    • Title Desc
    • Year Asc
    • Year Desc
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
  • Export
    • CSV
    • RIS
    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100

    Determining the Value of Standby Letter of Credit in Transfer Stage of a PPP Project to Control Concessionaire’s Opportunistic Behavior 

    Source: Journal of Management in Engineering:;2019:;Volume ( 035 ):;issue: 003
    Author(s): Liguang Wang; Xueqing Zhang
    Publisher: American Society of Civil Engineers
    Abstract: Most public–private partnership (PPP) projects would be transferred back to the government at the end of the concession period. To pursue maximum profit, the concessionaire may overuse the facilities without proper maintenance ...
    Request PDF

    Critical Success Factors for the Management of Public Participation in Urban Renewal Projects: Perspectives from Governments and the Public in China 

    Source: Journal of Urban Planning and Development:;2018:;Volume ( 144 ):;issue: 003
    Author(s): Liu Bingsheng;Wang Xueqing;Xia Nini;Ni Wei
    Publisher: American Society of Civil Engineers
    Abstract: Public participation is critical to the development of urban renewal projects. This research aims to explore critical factors for successful management of public participation processes in urban renewal. Government officials ...
    Request PDF

    Achieving Optimal Risk Allocation for Electric Vehicle Charging Infrastructure PPP Projects: A Bargaining Game Model with Consideration of Bilateral Reciprocal Preferences 

    Source: Journal of Management in Engineering:;2025:;Volume ( 041 ):;issue: 005:;page 04025034-1
    Author(s): Guo, Sijia; Liu, Yunfeng; Chen, Yangyang; Wang, Xueqing
    Publisher: American Society of Civil Engineers
    Abstract: AbstractWith growing environmental and energy concerns, developing the electric vehicle (EV) industry has become an important global strategy. Integral to this strategy is the construction and operation of the EV charging ...
    Request PDF
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     

    Author

    Publisher

    Year

    Type

    Content Type

    Publication Title

    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian