Time-Profit Trade-Off Analysis for Construction Projects
Publisher: American Society of Civil Engineers
Abstract: This paper presents a multiobjective optimization model that provides new and unique capabilities including generating and evaluating optimal/near-optimal construction resource utilization and scheduling plans that ...
Closure to “Time-Profit Trade-Off Analysis for Construction Projects” by Ahmed Senouci and Khaled El-Rayes
Publisher: American Society of Civil Engineers
Resource Scheduling Using Neural Dynamics Model of Adeli and Park
Publisher: American Society of Civil Engineers
Abstract: This paper presents a mathematical model for resource scheduling considering project scheduling characteristics generally ignored in prior research, including precedence relationships, multiple crew-strategies, and time ...
Rubber‐Tire Particles as Concrete Aggregate
Publisher: American Society of Civil Engineers
Abstract: Accumulations of worn‐out automobile tires create fire and health hazards. As a possible solution to the problem of scrap‐tire disposal, an experimental study was conducted to examine the potential of using tire chips and ...
Dynamic Programming Approach to Scheduling of Nonserial Linear Project
Publisher: American Society of Civil Engineers
Abstract: This paper presents a nonserial dynamic programming formulation for the scheduling of linear projects with nonsequential activities. One of the major advantages of the approach presented is its ability to handle both serial ...
Use of Scrap Tires in Road Construction
Publisher: American Society of Civil Engineers
Abstract: Growing piles of discarded tires create fire and health hazards. Current disposal methods are wasteful and costly. This paper presents the results of an investigation into the potential of shredded tires as fill material ...
Design Optimization of Concrete-Slab Forms
Publisher: American Society of Civil Engineers
Abstract: This paper presents a design optimization method for all-wood concrete-slab forms. This procedure was formulated to provide for a safe slab-form design with minimum cost. It considers in its design process the cost of each ...
Use of Genetic Algorithms in Resource Scheduling of Construction Projects
Publisher: American Society of Civil Engineers
Abstract: This paper presents an augmented Lagrangian genetic algorithm model for resource scheduling. The algorithm considers scheduling characteristics that were ignored in prior research. Previous resource scheduling formulations ...
Modeling Failure of Oil Pipelines
Publisher: ASCE
Abstract: As the safest means of transporting gas and hazardous materials, pipelines transport invaluable petroleum material. However, a considerable number of accidents have happened involving these facilities, leading to economic ...
Organizational Behavior Attributes and Sustainable Construction Adoption: An Econometric Analysis Using Data from Qatar
Publisher: American Society of Civil Engineers