YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    Search 
    •   YE&T Library
    • Search
    •   YE&T Library
    • Search
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Use filters to refine the search results.

    Now showing items 1-2 of 2

    • Relevance
    • Title Asc
    • Title Desc
    • Year Asc
    • Year Desc
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
  • Export
    • CSV
    • RIS
    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100

    4D-BIM Dynamic Time–Space Conflict Detection and Quantification System for Building Construction Projects 

    Source: Journal of Construction Engineering and Management:;2018:;Volume ( 144 ):;issue: 007
    Author(s): Mirzaei Ali;Nasirzadeh Farnad;Parchami Jalal Majid;Zamani Yasin
    Publisher: American Society of Civil Engineers
    Abstract: Workspace in construction projects is considered a resource and a constraint that needs to be addressed in project scheduling. Without proper workspace planning, time–space conflicts frequently may occur at construction ...
    Request PDF

    A Hybrid Model for Selecting the Optimal Project Delivery System for Outsourcing Design–Build and Operation–Maintenance Together in Water and Wastewater Projects 

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2025:;Volume ( 017 ):;issue: 004:;page 04525053-1
    Author(s): Akhoondi, Fatemeh; Parchami-Jalal, Majid; Seyed-Alangi, Fateme
    Publisher: American Society of Civil Engineers
    Abstract: AbstractThe choice of a project delivery system (PDS) significantly impacts the successful and efficient delivery of construction projects. Selecting a system that best meets the project’s and client’s needs is crucial. ...
    Request PDF
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     

    Author

    Publisher

    Year

    Type

    Content Type

    Publication Title

    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian