Search
Now showing items 1-6 of 6
Development of a Design Quality Indicators Toolkit for Campus Facilities Using the Delphi Approach
Publisher: ASCE
Abstract: The lack of standardized design quality indicators (DQIs) has hindered the proliferation of Post-Occupancy Evaluations (POEs) as a standard process in the property sector. This research aims to develop a standardized set ...
Holistic Postoccupancy Evaluation Framework for Campus Residential Housing Facilities
Publisher: American Society of Civil Engineers
Abstract: This paper presents a holistic postoccupancy evaluation (POE) framework and its application to a campus residential facility. The development of a framework was based on an extensive review of literature and an identification ...
Post-Occupancy Evaluation of Housing Facilities: Overview and Summary of Methods
Publisher: American Society of Civil Engineers
Abstract: Although post-occupancy evaluation (POE) is an old tool with hundreds of studies, it is yet to become routine in the housing industry. The growing complexity of buildings and emerging trends in the industry further reinforces ...
Post-Occupancy Evaluation of Housing Facilities: Overview and Summary of Methods
Publisher: American Society of Civil Engineers
Abstract: Although post-occupancy evaluation (POE) is an old tool with hundreds of studies, it is yet to become routine in the housing industry. The growing complexity of buildings and emerging trends in the industry further reinforces ...
Modeling Knowledge for MEP Coordination in Building Projects in Saudi Arabia
Publisher: American Society of Civil Engineers
Abstract: For many years, the building industry in many countries has been plagued by issues of poor quality, cost overruns, and construction delays. This has been largely attributed to the continuous fragmentation of the industry ...
Modeling Knowledge for MEP Coordination in Building Projects in Saudi Arabia
Publisher: American Society of Civil Engineers
Abstract: For many years, the building industry in many countries has been plagued by issues of poor quality, cost overruns, and construction delays. This has been largely attributed to the continuous fragmentation of the industry ...
CSV
RIS