Search
Now showing items 1-10 of 15
Ranking of the Factors Affecting Productivity of Microtunneling Projects
Publisher: American Society of Civil Engineers
Abstract: The need to provide utility service lines with less disruption to the ground surface has increased the demand for trenchless excavation methods like microtunneling. Although the microtunneling technique has been used in ...
Anchorage System to Prestress FRP Laminates for Flexural Strengthening of Steel-Concrete Composite Girders
Publisher: American Society of Civil Engineers
Abstract: Using externally bonded (EB) fiber-reinforced polymer (FRP) laminates for strengthening steel-concrete composite girders has recently received more attention from researchers. By prestressing the EB FRP laminates, the ...
Decision Support System for Commencement Delay Claims
Publisher: American Society of Civil Engineers
Abstract: Delay claims are common in construction projects. Commencement delay claims are different, as the owner is responsible for the delay. This paper presents a methodology to solve the conflict of a commencement delay event ...
Productivity Analysis for Boulac’s Wastewater Microtunnels in Egypt
Publisher: American Society of Civil Engineers
Abstract: The need for utility service line replacement or repairs with minimum disruption to the surface has increased the demand for trenchless excavation methods like microtunneling. Microtunneling is a trenchless technique that ...
Closure to “Developing a Complexity Measure for Project Schedules” by Khaled M. Nassar and Mohamed Y. Hegab
Publisher: American Society of Civil Engineers
Developing a Complexity Measure for Project Schedules
Publisher: American Society of Civil Engineers
Abstract: Several factors contribute to the complexity of project schedules, including the number of activities, the level of detail, and the shape of the project network. This paper presents a measure that assesses the complexity ...
Delay Time Analysis in Microtunneling Projects
Publisher: American Society of Civil Engineers
Abstract: Delay in microtunneling projects is a complex multivariate problem. Delay in microtunneling is defined as the nonworking time of a microtunneling project due to any reason other than scheduled stops. There are many reasons ...
Experimental Analysis of Embankment on Ordinary and Encased Stone Columns
Publisher: American Society of Civil Engineers
Abstract: This work investigated the behavior of embankment models resting on soft soil reinforced with ordinary and encased stone columns (ESCs). Model tests were performed with different spacing distances between stone columns and ...
Experimental Analysis of Embankment on Ordinary and Encased Stone Columns
Publisher: American Society of Civil Engineers
Abstract: This work investigated the behavior of embankment models resting on soft soil reinforced with ordinary and encased stone columns (ESCs). Model tests were performed with different spacing distances between stone columns and ...
Evaluating Cost Overruns of Asphalt Paving Project Using Statistical Process Control Methods
Publisher: American Society of Civil Engineers
Abstract: While some projects will experience changes to the contracted cost by deduction or additions, construction cost overruns are becoming a common problem in the construction industry. Steps need to be taken to minimize cost ...
CSV
RIS