Now showing items 1-2 of 2
Pump Testing Boulder Zone Aquifer, South Florida
Publisher: American Society of Civil Engineers
Abstract: Pumping tests were performed on a 3,200 ft (976 m) deep injection well tapping the Boulder Zone near Miami, Florida, as a part of the construction and testing of a deep well injection system for the proposed Miami‐Dade ...
Cleanup of Miami Drum Hazardous Waste Site
Publisher: American Society of Civil Engineers
Abstract: The Miami Drum Site, located in a predominantly industrial area of Miami, is one of Florida's highest priority hazardous waste sites. Miami Drum Services, an inactive drum recycling facility, operated at this site for 15 ...
CSV
RIS