Search
Now showing items 1-1 of 1
Distribution and Variation of Earth Pressure Applied on Submerged Toe-Retaining Walls in Rockfill Dam Engineering
Publisher: ASCE
Abstract: A high concrete gravity retaining wall is usually built at the toe of concrete face rockfill dams to accommodate the toe plinth, to avoid adverse natural conditions or excessive excavation. However, earth pressure on the ...
CSV
RIS