Search
Now showing items 1-3 of 3
Discussion of “<i>Piezometer Installation under Artesian Conditions</i>” by Kulbhushan L. Logani (August, 1983)
Publisher: American Society of Civil Engineers
Artesian Pressure Relief for Trident Drydock
Publisher: American Society of Civil Engineers
Abstract: Construction of the Trident drydock required lowering piezometric levels in a sand and gravel aquifer underlying the drydock site 100 ft (30.5 m). The design of the construction dewatering system was based on a 15‐day, ...
Closure to “<i>Cellular Cofferdam for Trident Drydock: Performance</i>” by Max D. Sorota, Edward B. Kinner, and Mark X. Haley (December, 1981)
Publisher: American Society of Civil Engineers
CSV
RIS