YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    Search 
    •   YE&T Library
    • Search
    •   YE&T Library
    • Search
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Use filters to refine the search results.

    Now showing items 1-2 of 2

    • Relevance
    • Title Asc
    • Title Desc
    • Year Asc
    • Year Desc
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
  • Export
    • CSV
    • RIS
    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100

    An Efficient Random Key–Based Genetic Algorithm for Solving Multimode Resource-Constrained Project Scheduling Problem 

    Source: Journal of Construction Engineering and Management:;2025:;Volume ( 151 ):;issue: 012:;page 04025193-1
    Author(s): Liu, Jia; Chen, Jianwei; Tian, Jiefang; Li, Yang
    Publisher: American Society of Civil Engineers
    Abstract: AbstractThe multimode resource-constrained project scheduling problem (MRCPSP) is recognized as a well-known NP-hard combinatorial optimization problem. It incorporates both renewable and nonrenewable resources, along with ...
    Request PDF

    Optimizing Constrained Construction Crew-Task Assignment with Grey Wolf Optimizer 

    Source: Journal of Construction Engineering and Management:;2026:;Volume ( 152 ):;issue: 008:;page 04026118-1
    Author(s): Liu, Jia; Chen, Jianwei; Li, Yang; Zhao, Kaiyue
    Publisher: American Society of Civil Engineers
    Abstract: AbstractCrew-task assignment is a critical component of labor planning in construction engineering, directly impacting work continuity, project schedule, and cost control. In construction projects, ineffective crew-task ...
    Request PDF
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     

    Author

    Publisher

    Year

    Type

    Content Type

    Publication Title

    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian