Search
Now showing items 1-6 of 6
Closure to “<i>Transformation of PMP to PMF: Case Studies</i>” by Bi‐Huei Wang and Khalid Jawed (July, 1986, Vol. 112, No. 7)
Publisher: American Society of Civil Engineers
Estimation of Probable Maximum Precipitation: Case Studies
Publisher: American Society of Civil Engineers
Abstract: Depending on the type, scope and location of the project, availability of data, stage of the study and other considerations, the probable maximum precipitation (PMP) used in the probable maximum flood (PMF) analysis may ...
Closure to “<i>Estimation of Probable Maximum Precipitation: Case Studies</i>” by Bi‐Huei Wang (October, 1984, Vol. 110, No. 12)
Publisher: American Society of Civil Engineers
Transformation of PMP to PMF: Case Studies
Publisher: American Society of Civil Engineers
Abstract: There are various methods for transforming probable maximum precipitation (PMP) to probable maximum flood (PMF). Each method involves several steps during which certain assumptions have to be made and subjective judgments ...
Conservatism of Probable Maximum Flood Estimates
Publisher: American Society of Civil Engineers
Abstract: Depending on assumptions and data used in analysis, a probable maximum flood (PMF) can vary over a wide range of values each associated with a certain degree of conservatism. This paper presents a procedure which potentially ...
Closure to “<i>Conservatism of Probable Maximum Flood Estimates</i>” by Bi‐Huei Wang and Russell W. Revell (March, 1983)
Publisher: American Society of Civil Engineers
CSV
RIS