Users of this system, can login to view this document.
Login
Enter the following information to request a copy of the document from the responsible person.
Erratum: “Start-Up Optimization of a CCGT Power Station Using Model-Based Gas Turbine Control” [ASME J. Eng. Gas Turbines Power, 2019, 141(4), p. 041018
This email address is used for sending the document.